






















Your Custom Text Here
Eight days in September (through September 18) bring lots of change. Smoke engulfs Vancouver Island. Don’s arrival in Everett imminent. Covid cases spike. Ruth Bader Ginsburg passes.
Last Friday: A visit to Nathan’s workshop Part & Whole to see where our couch is to be made.
Weekend hunt for G25 and G30 LED dimmable bulbs to use in the light fixtures that David has made
Tuesday: David Scott comes to the house and so do lots of the specialists - Stan from Matrix comes to measure the honed marble counters & fireplace surround.
Taylor (Frontera), David (Scott & Scott) and Michael (Michael Ford Design) work out cabinet, window and wall alignments
Stan takes more measurements - Wendy forgot to take pictures when Andrew Namur (excavator) visited
Intrepid mascot in hot pursuit of heron - smoke and fog at low tide
Thursday: Viridian puts the solar panels on the roof on a day of no sun
On an alley walk a back door lock set catches my eye —— resolve to get one like it for refurbished cellar door. The source Price’s locksmith which has been in business for over a century. Charmaine is my locksmith. Quite a bit of inventory at Price’s!
Detail of the kitchen primed and ready to be painted
Doorbell Waterglass studios makes them - also visit Royal Oak Glass for mirror & Associated Sheet Metal for stainless steel panel
Ralph finished the shingling this past week free time to visit Ben at Bespoke the source for our Farrow & Ball paint entre autres
Drywall tool used by Brian and Ian of Devlin’s Wall systems who are at work on the interiors
Nicholas and Ilse of Nicholas Alexander Painting prime the kitchen walls
The living room coming into focus
Hand me down brackets will hold a mirrored shelf in bath
Looking from west to east upstairs
At work on the bedroom
Ralph’s giant dryer - for shingles
The Viridian team begins to work on laying the solar panels view to the east on a smoky day